One job, start to finish
A parkade entrance, from bare slab to sealed deck
The same doorway photographed at three stages of the same job. Most of what decides whether a coating lasts happens before any membrane goes down, so the preparation is shown here too, not just the result.
-

01 Preparation
The slab is mechanically ground to remove laitance and open the surface profile, so the system bonds to sound concrete rather than to contamination.
-

02 Application
Membrane and base coats are laid down wet-on-wet at the specified thickness, carried up the perimeter to form a continuous, sealed surface.
-

03 Completed
The wear coat is finished to a uniform, slip-resistant surface and cured before traffic returns — sealed at the drain and along every edge.
From the job site
More of the work
Parkade preparation, finished surfaces, and the site details in between.
Parkade preparation
-

Shot-blasting an underground parkade deck. The dust collector on the left is hosed to the blast machine the crew is running. -

The same parkade after shot-blasting. The lane marks show each pass of the machine.
Parkade details
-

A stall under a textured grey traffic coating, carried up the base of the wall. -

Measuring a trench drain on site. Drains and transitions are where coatings fail first.
Balconies and walkways
-

An upper-floor balcony with work under way. -

A coated balcony deck with a view over the city. -

A concrete walkway under a light-grey coating.
Get started
Request Your Free Quote
How It Works
- Tell us who you are and how to reach you.
- Pick the service your surface needs, if you know it.
- Add square footage and location if you know them, then send it over.
